User Tools

Site Tools


Sidebar

Go to GMDH home page

Video Tutorials

User Guide

1. Streamline Client

2.Streamline Server

3. Starting Up

4. Connecting data

5. Demand and Sales Forecasting

6. Inventory Planning

7. Reference

inter-store-transfers-planning

5.8. Intersite Transfers Planning

Streamline is able to optimize your inventory by releasing frozen capital internally, and replenish your locations using your own overstocks instead of making any more replenishment orders from your suppliers or distribution centers.

If your business is spread out over several separate regions so that each of them contains a set of locations where inventory transfers are allowed, Streamline can account for these constraints and generate transfers within the given areas.

In this article you will learn:

To demonstrate all of these, we use a little project based on a database source. We have only two products here, t-shirt and dress that are sold in three stores, east, north and west (see figure below).

There are overstocks for three planning items, and, at the same time, two items have stockouts. Let's see, if Streamline can restock required quantities using intersite transfers. By default, intersite optimization feature is disabled. Let's enable it.

Enabling Intersite Optimization

To enable intersite optimization:

  1. Go to the menu File > Settings.
  2. Navigate to the Project tab of the Settings dialog.
  3. Check the option Enable intersite optimization under the Inventory planning group (see figure below).

There is also a control for setting the default lead time for a transfer, in case the destination location is not supplied from a DC normally – Default intersite lead time. By default, it is 1 day.

After we click OK, a new column Available for transfer has been added into the Inventory planning tab, and a new tab called Intersite optimization has been added into the set of application tabs (see figure below).

The Available for transfer column shows an overstock quantity that can be used to replenish other locations through intersite transfers. It indicates the minimal expected overstock amount during the Lead time (in our case, 30 days).


As you see from the figure below, the available quantity is enough to cover both stockouts.

Let's proceed to the Intersite optimization tab and see the suggested transfers (see figure below).

We have two transfers here, each covers the required stockout at a particular location completely. Streamline uses a special method to generate intersite transfers. The quantity to transfer not always equals to the Stockout amount. It is found as a minimum between replenishment quantity recalculated for the Default intersite lead time (or lead time from DC) and Stockout. In our example, the minimum drop to the Stockout for both transfers. Let's check this out.

To do this, we go to the Inventory planning tab and set Lead time to 1 day for items with stockouts (see figure below).

As you see, suggested quantities 203 and 248 are bigger than the corresponding stockouts 190 and 83.

Note: If the Stockout amount is less than Net Order, then Streamline will suggest transfering exactly the Stockout amount. No rounding, min lot or max lot will be taken into account.

Now, let's explain how Streamline calculates the delivery date for transfer orders.

Transfer Order Delivery Date Calculation

Streamline determines the delivery date for a transfer following the logic:

  • If the destination location is not tied to a DC, Streamline considers the transfer to arrive after the Default intersite lead time. For example, if the current date is Sep 2, 2018, and the Default intersite lead time is 1 day (which is the default value), then Streamline determines the delivery date as Sep 3, 2018.
  • If the destination location is normally supplied from a DC, it is calculated as:

Delivery date = Today date + Lead time,

where:

  • Lead time – the interval of time required to deliver the item from the distribution center to the destination location.
  • Today date – the current local date set in your operating system.

Let's demonstrate both situations.

Our example doesn't have a distribution center configured, it contains stores only. The today date is Sep 25, 2019, thus, Streamline determines the delivery date as Sep 26, 2019 and shows it in the Delivery date column (see figure below).

To illustrate the second case, we enabled distribution center and configured it to incorporate the east location. The Lead time is 30 days. Now, the delivery date is Oct 25, 2019 (see figure below).

Delivery date is a Streamline's promised date the item to be received on. Of course, you can modify or reset it in your system after the transfer orders have been exported in there.

Now, let us show how to introduce region constraint in the optimization.

Applying Transfer Region Constraint

To be able Streamline to put region constraint on the generated transfers, the Transfer region data type should be configured and imported along with other information about your inventory. To do this, we will reconfigure our connection setting to the database:http://direct.gmdhsoftware.com/documentation-sl/lib/images/toolbar/image.png

  1. Go to the menu File > Change connection > Database connection.
  2. Navigate to the Item info tab, click the Preview button to execute our query. This query returns a table containing descriptive information for each planning item. The last column of the table contains the transfer region (see figure below).

3. Now we match this column to the Transfer region meaning selected from the dropdown (see figure below).

4. To import the column, we click OK.

After application the transfer region constraint, the transfer of 190 units for dress has disappeared (see figure below).

That has happened because the location with the overstock is located in a different region (see figure below).

Exporting Intersite Transfer Orders

To export intersite transfer orders:

  1. Go to the Intersite optimization tab.
  2. Click the Planned orders button found on the toolbar. The Planned orders preview dialog appears (see figure below).

There are several exporting options:

  • Export to XLSX button exports the orders to an Excel file.
  • Export to CSV button exports them to a CSV file that can also be opened in Excel. Typically, this option is used to export huge orders.
  • Create button exports orders to the database.

3. We click the Create button to export our orders right to the database.

As soon as orders have been exported, Streamline:

  • clears the exported lines from the Intersite optimization tab; and
  • adds the corresponding transactions into the To receive list of the In transition details dialog.

Let's check this. We click the In transition details button found on the toolbar to open the In transition details dialog (see figure below).

Now, along with other orders which are to be received, Streamline shows the just now exported orders. These orders got an Export mark in the Order number column.

Lines with the Export mark have no common with the real orders-to-receive that are in your ERP's database. It's just internal Streamline's transactions that are created in order to keep the inventory planning workflow correct.
If Streamline is integrated with your system so that clicking the Create button automatically creates the corresponding open orders, the mark Export will disappear for the exported lines in the To receive tab after you click the Update data button. Otherwise, the Update data command will completely remove the exported lines from the To receive tab.

Next: Material Requirements Planning

Download PDF

inter-store-transfers-planning.txt · Last modified: 2023/06/21 19:52 by admin